The project consists of the blast furnace body and iron casting yard, material bin and main belt corridor, hot blast stove and preheater, gravity dust collector, blast furnace main control room, water flushing slag system, blower room, high-voltage distribution room, gas wet dust removal, gas cleaning water treatment facilities, combined pump room, coal powder room and raw coal yard, coal injection air compression station, iron casting yard dust removal, and iron tank repair room. The project covers an area of approximately 3 million square meters, with an annual output of 2 million tons of iron and a blast furnace capacity of 2650m3. The project started on April 5, 2003 and was completed on November 30, 2004.
The project consists of the blast furnace body and iron casting yard, material bin and main belt corridor, hot blast stove and preheater, gravity dust collector, blast furnace main control room, water flushing slag system, blower room, high-voltage distribution room, gas wet dust removal, gas cleaning water treatment facilities, combined pump room, coal powder room and raw coal yard, coal injection air compression station, iron casting yard dust removal, and iron tank repair room. The project covers an area of approximately 3 million square meters, with an annual output of 2 million tons of iron and a blast furnace capacity of 2650m3. The project started on April 5, 2003 and was completed on November 30, 2004.