The construction area of the project is 43470m2. The construction period is from April 2004 to September 2005.
Steel rolling equipment: total weight 3667.22 tons (excluding the weight of the main motor),
Among them: 1. Furnace area equipment: 152t; 2. Main rolling line equipment: 2860.09t; 3. Crane transportation equipment: 694.05t. The engineering design scale has an annual steel production capacity of 500000 tons/year, and the main products are high value-added round bars such as steel for automobile and machinery manufacturing.
高强度机械制造用钢生产线主厂房外景
高强度机械制造用钢生产线
The construction area of the project is 43470m2. The construction period is from April 2004 to September 2005.
Steel rolling equipment: total weight 3667.22 tons (excluding the weight of the main motor),
Among them: 1. Furnace area equipment: 152t; 2. Main rolling line equipment: 2860.09t; 3. Crane transportation equipment: 694.05t. The engineering design scale has an annual steel production capacity of 500000 tons/year, and the main products are high value-added round bars such as steel for automobile and machinery manufacturing.
高强度机械制造用钢生产线主厂房外景
高强度机械制造用钢生产线