In 1993, Beijing Shougang Construction Group Co., Ltd. undertook the construction of Shougang's first 80000 cubic meter dry gas cabinet project. The project adopted multiple advanced technologies and completed the steel structure production and installation of a 1458 ton dry gas cabinet with high quality and speed 8 days ahead of design.
In 1993, Beijing Shougang Construction Group Co., Ltd. undertook the construction of Shougang's first 80000 cubic meter dry gas cabinet project. The project adopted multiple advanced technologies and completed the steel structure production and installation of a 1458 ton dry gas cabinet with high quality and speed 8 days ahead of design.