The project is located in the Shougang factory area of Shijingshan District, Beijing, with a total length of 2990 meters and a main tunnel size of 2.6 meters by 2.9 meters. It is divided into cable tunnels and power ducts. Construction began in 2015 and the project has now reached the completion conditions.
The project is located in the Shougang factory area of Shijingshan District, Beijing, with a total length of 2990 meters and a main tunnel size of 2.6 meters by 2.9 meters. It is divided into cable tunnels and power ducts. Construction began in 2015 and the project has now reached the completion conditions.