This project is located on the south side of the bar workshop of Shougang Changgang Company in Changzhi City, Shanxi Province, and on the north side of the new 309 National Highway. The total land area is 66667 square meters, and a daily processing capacity of 1500 tons of domestic waste incineration power plant will be constructed. The first phase has a capacity of 1000 tons/day and adopts a 2 × 500 tons/day incineration line, equipped with a 18MW steam turbine generator unit. The main structures include the comprehensive main factory building, chimney, comprehensive water pump room and cooling tower, industrial fire water tank, leachate treatment station, booster station and other facilities.
This project is located on the south side of the bar workshop of Shougang Changgang Company in Changzhi City, Shanxi Province, and on the north side of the new 309 National Highway. The total land area is 66667 square meters, and a daily processing capacity of 1500 tons of domestic waste incineration power plant will be constructed. The first phase has a capacity of 1000 tons/day and adopts a 2 × 500 tons/day incineration line, equipped with a 18MW steam turbine generator unit. The main structures include the comprehensive main factory building, chimney, comprehensive water pump room and cooling tower, industrial fire water tank, leachate treatment station, booster station and other facilities.