1 # Building Cloud Computing Center and 6 other projects (Project No. 16 of Shoute Green Energy Port Technology Center)
2025-04-08 08:50
largemidsmallprint

       The project is located on Yangzhuang Street, Shijingshan District, Beijing. It started construction on March 15, 2018 and was completed on March 18, 2022. It features frame shear walls and frame structures, with a building area of 96953 square meters. It was awarded the Silver Medal of the Great Wall Cup for Structural Design in Beijing in 2019-2020.

Company performance

       The project is located on Yangzhuang Street, Shijingshan District, Beijing. It started construction on March 15, 2018 and was completed on March 18, 2022. It features frame shear walls and frame structures, with a building area of 96953 square meters. It was awarded the Silver Medal of the Great Wall Cup for Structural Design in Beijing in 2019-2020.