The project is located in Yantai City, Shandong Province, with a total construction area of 760000 square meters. It is a reinforced concrete frame shear wall structure, of which 200000 square meters were constructed by Shoujian Group. The construction started in December 2013 and was completed in December 2015.
The project is located in Yantai City, Shandong Province, with a total construction area of 760000 square meters. It is a reinforced concrete frame shear wall structure, of which 200000 square meters were constructed by Shoujian Group. The construction started in December 2013 and was completed in December 2015.